Our Construction Projects
View first hand the diversity of our projects by viewing some of our case studies below

Hinkley Point Power Station (2020)
The Ridgesteel team completed the structural steel framework including the design, fabrication and build package for Hinkley Point Nuclear Power Station. In total approximately 400 tons of steel work was put up, in only 6 weeks with very challenging weather and timescales.

Mercedes Dealership (2020)
The Ridgesteel team are completing the structural steel framework including the design, fabrication and build package for a Mercedes Dealership in Smethwick.

Hotel Fire Escape (2019)
Designed and fabricated the steel balustrade and staircase for the fire escape at a large hotel in Weston-Super-Mare. From drawings, fabrication to installation top quality craftsmanship and expertise were at the forefront.

Apollo Site B (2018)
This project required the fabrication and installation of the steel work. RidgeSteel also installed all of the cladding for this project.

Latham's Steel Doors (2018)
The project was an extension for Latham Doors all designed, fabricated and installed by us, including additional internal fixtures and fittings, plus external metal work packages.

Coalville Glass & Glazing (2019)
The Ridgesteel team completed the structural steel and cladding – design, fabricate and build package for Coalville Glass and Glazing, 4 weeks ahead of schedule!

ISG Project (2018/19)
RidgeSteel were contracted to carry out a number of steel and architectural metalwork packages for ISG for their new site at Imperial College, London, White City.

Aston Barclay (2018)
Design, fabrication and steel erection of external steelwork for Aston Barclay Behicle Remarketing mega building.

Manor End House (2017)
Design, fabricaion and installation of bespoke steel staircase and balustrades.

Truckstop-Hawkes (2018)
This project in Redditch required the design, build and fabrication of a full steel structure factory extension, including all ground works and internal mezzanine floor.

Audi Goodwood (2017)
The project was a design, fabrication and installation at the Goodwood Festival of Speed.

Abbey Mill School (2017)
Design, fabrication and installation of steel railings

Staffordshire Fire and Rescue (2016)
Design, fabrication and installation of steel fire safety equipment

Purogenix (2016)
The project was a design, fabrication and installation of a mezzanine floor at Purogenix in Sandwich
Have a Project in Mind?
Let’s Get Fabricating
Contact Us
Ridgesteel Fabrications Limited
Unit 4 Schofield Business Park , Sugarbrook Road , Bromsgrove , B603DN